Client: Outrigger Resorts Australia
Location: Ocean Ave Surfers Paradise for Outrigger Resorts
Brief: Supply, Install, test and commission the following quantities of Fujitsu air conditioning equipment.
1) 42 X 8.8 KW Ducted Systems
2) 60 X 5.2 KW Multi Head Systems
3) 85 X 3.5 & 6.5 KW Wall Mounted Split Systems
4) 12 X 8.0 KW Cassette Systems
Start Date: 1/5/1999
Target Completion: 12/10/1999
Project: Q-Superstore Showroom
Client: Clive Anthonys Superstore
Location: Bermuda St Mermaid Waters
Brief: Supply, Install, test and commission 80 KW Uni-Aire Rooftop Package unit including ductwork, grilles and controls.
Start Date: 4/1/2000
Target Completion: 1/2/2000
Client: Surfers Paradise Duty Free Pty Ltd
Location: 3145 Gold Coast Highway Surfers Paradise.
Brief: Remove corroded Rooftop Packaged Units. Design and Construct with 2 X Email air RM 60 Rooftop Units. Remove and replace structural support frames.
Start Date: 4/1/2001
Target Completion: 26/2/2001
Client: REA Holdings Pty Ltd
Location: River St Mackay
Brief: Design and Construct, test and commission a 32 Kilowatt and 42 Kilowatt Rooftop Packaged Unit incl. ductwork, grilles and controls.
Start date: 1/2/2003
Target Completion: 31/3/2003
Client: Dean Concepts Builders
Location: Victoria St Mackay
Brief: Design and Construct, test and commission the following equipment.
4 x 10 Kilowatt Mitsubishi Cassettes and integrated fresh air system.
1 x Mechanical ventilation system.
1 x 40 Kilowatt Taitron Rooftop Packaged Unit incl. ductwork, grilles and controls.
1 x 60 Kilowatt Taitron Rooftop Packaged Unit incl. ductwork, grilles and controls.
Start Date: 12/12/2003
Target Completion: 31/3/2004
Project: Goonyella Mine Wash-Plant Control Room.
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct, Install test and commission the following equipment.
1 x Daikin 24 KW ?VRV? 2 variable refrigerant volume system with 7 indoor units.
1 x Daikin 10 Kilowatt Sky-Air Under-ceiling unit.
2 x Daikin 7 Kilowatt Sky-Air under ceiling unit.
Start Date: 2/4/2007
Target Completion: 25/7/2004
Project: Riverside Mine Group Engineering Offices.
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct, Install test and commission a Daikin 24 KW ?VRV?2 variable refrigerant volume system with 10 indoor units.
Start Date: 21/8/2005
Target Completion: 12/09/2005
Project: Goonyella Administration office Upgrade.
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct a Daikin 28 KW ?VRV? 2 variable refrigerant volume system with 1 indoor unit and associated ductwork.
Completion: 10/11/2005
Target Completion: 15/12/2005
Project: Goonyella Wash plant Main M.C.C (Sub 03)
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct a 40 KW A.P.A.C packaged unit and an 85 KW A.P.A.C remote air cooled packaged unit with 1.2 mm stainless steel ducting. Re-locate existing Temperzone air conditioning system.
Start Date: 28/3/2006
Target Completion: 30/6/2006
Project: Goonyella Meeting and Conference Rooms Upgrade
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct 28 KW ?VRV? variable refrigerant volume systems with 2 ducted fan coils and 1Wall mounted unit to serve the Kitchenette.
Start Date: 14/01/2006
Target Completion: 30/6/2006
Client: Colin Hounsell Constructions
Location: Hamilton Island
Consulting Engineer: Lincolne Scott
Brief: Supply and installation of 52 x 6 Star Bungalows with 12 & 14 Kilowatt Daikin Inverter Ducted systems and Toilet exhaust systems. As per consultants design.
Start Date: 14/2/2006
Target Completion: 30/7/2007
Project: Shorelines Stage 3 Hamilton Island
Client: Colin Hounsell Constructions
Location: LOT LK Hamilton Island
Consulting Engineer: Connell Mott Macdonald
Brief: Supply and installation of Daikin Super Multi Plus systems as per consulting engineers design.
Start Date 2/2/2005
Target Completion: 30/8/2007
Project: Goonyella Riverside Mine Maintenance Facility
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct a 54 kilowatt Actron packaged unit to serve the maintenance facility crib and meeting rooms.
Start date: 1/6/2007
Target Completion: 30/6/2007
Project: Northpoint Ridge Building
Builder: Whitsunday Pole Homes
Location: Hamilton Island QLD
Consulting Engineer: Lincolne Scott
Brief: Manufacture and install 6.5 metre x 1.2 metre Stainless Steel exhaust canopy, complete with make-up air system and Stainless Steel Dishwasher Hood. Re-design ductwork. Supply and install 40 KW Temperzone units for Kitchen. Supply and install 16 Kilowatt Temperzone unit to Foyer and Office. Supply and install Air change heat exchanger incorporated into toilet exhaust system. As per consultants design. Design supply and install 12Kilowatt Daikin VRV System for the Library.
Start Date: 1/6/06
Target Completion: 30/7/07
Project: Goonyella Riverside Main MCC Prep Plant 2
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct a 92 kilowatt Actron packaged unit to serve the M.C.C.
Start date: 10/9/2007
Target Completion: 16/9/2007
Project: Goonyella Riverside Train Load out Facility CPP 2
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Consulting Engineer: Mr Brian Talty of A/C Design Services
Brief: Design and Construct a 47 kilowatt Actron packaged unit to serve the Train Load out M.C.C.
Start date: 1/9/2007
Target Completion: 20/9/2007
Project: Riverside Female Bathouse Upgrade
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and construct a 47 Kilowatt Packaged unit with exposed internal ductwork for the Pre-Start
room. Design and construct evaporative cooling system for Bathouse Area. Supply and install Hot
Water heat pump for showers.
Start Date: 7/3/2008
Target Completion: 30/6/2008
Location: Site Senior Executive Residence Moranbah
Brief: Remove and replace air-conditioning systems and insulate ceiling with polyester batts.
Supply and install 23 Kilowatt Actron Ultima ducted system to bring residence within scope of
current B.C.A energy efficiency requirements. Install retractable drop down ladder to resolve work
at heights issues for future service requirements.
Start Date: 21/1/2008
Target Completion: 10/4/2008
Client: BHP Billiton Mitsubishi Alliance Dysart Town Office
Location: Dysart Township
Brief: Install 110 Fujitsu 3.4 Kilowatt Wall Mounted Split Systems
Start Date: 28/4/2008
Target Completion: 30/5/2008
Location: Curragh Mine Blackwater
Brief: Design and Manufacture Industrial Airconditioning units for Dragline 302. Fabricate and install ductwork to suit. Install and commission digital controls. Provide back-up service through defects liability period.
Start Date: 12/5/2008
Target Completion: 30/8/2008
Project: Leichardt Medical Centre
Client: Colin Mackenzie Builders
Location: St Francis Drive Moranbah
Brief: Design and Construct 35 Kilowatt Actron Packaged system and associated ductwork. Commission and provide12 Months Service.
Start Date: 19/5/2008
Target Completion: 30/6/2008
Client: Anglo Coal German Creek Mine
Location: Middlemount Tieri Rd Middlemount
Brief: Replace existing Carrier Airconditioning system with a 70 Kilowatt Actron Split Ducted system and re-make ductwork. Commission and provide12 Months Service.
Start Date: 23/6/2008
Target Completion: 30/6/2008
Project: Moranbah North Coal Administration Building
Client: Anglo Coal Australia
Location: Moranbah North Coal Mine
Brief: Carry out audit of Airconditioning systems and establish a benchmark with Climacheck systems.
Make recommendations to improve system efficiency and indoor air quality.
Start Date: 1/9/2008
Target Completion: 30/9/2008
Project: Riverside Train Loadout Clean Coal Substation
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct 47 kilowatt Actron Packaged System and associated ductwork. Commission and provide 12 Months Service.
Start Date: 14/8/2008
Target Completion: 30/9/2008
Project: Goonyella Coal Processing Bath house
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
Brief: Design and Construct Braemar evaporative cooling system to serve the bath house.
Start Date: 30/9/2008
Target Completion: 30/10/2008
Project: Riverside Mine I.T. Office
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine
Brief: Design and Construct 1 x 36 Kilowatt Actron packaged unit and associated ductwork and controls. Including civil works.
Start date 9/2/2009 Target Completion 27/3/2009
Location: Goonyella Riverside Mine
Brief: Design and Construct 2 x 16 Kilowatt Actron packaged units and associated ductwork and controls. Including civil works.
Start date 9/4/2009 Target Completion 27/5/2009 Total
Client: BHP Billiton Mitsubishi Alliance Dysart Town Office
Location: 14 Long Crescent Dysart.
Brief: Replace existing end of life Carrier ducted system with A.P.A.C. ducted system.
Start date 9/3/2009 Target Completion 27/3/2009
Location: Curtin House
Brief: Install 110 Fujitsu Split Systems
Start date 5/1/2009 Target Completion 9/2/2009
Project: German Creek Wash Plant Administration Building
Client: Anglo Coal Australia (Capcoal)
Location: Middlemount
Brief: Decommission and remove existing end of life carrier packaged system and supply and Install 10 Fujitsu Split Systems. Replace existing Mechanical Services Switchboard,
Start date 9/2/2009 Target Completion 27/3/2009
Client: BHP Billiton Mitsubishi Alliance Dysart Town Office
Location: 6 Long Crescent Dysart
Brief: Replace existing end of life ducting on central ducted system.
Start date 1/7/2009 Target Completion 1/8/2009
Project: Riverside I.T. Offices
Client: BHP Billiton Mitsubishi Alliance
Location: Goonyella Riverside Mine
Brief: Design and Construct 1 x36 Kilowatt Actron packaged unit and associated ductwork and controls. Including civil works.
Start date 9/2/2009 Target Completion 17/4/2009 Total