Layout Image
Layout Image

Archive for October, 2010

AerisGuardHealthy Buildings Healthy Planet

The first comprehensive program to protect against mould, bacterial and fungal contamination of HVAC systems.

Find out how healthy is your building and how prevention is better than cure.

Download the AerisGuard Total HVAC Protection System PDF

AerisGuard Bioactive Enzyme Coil Cleaner

  • Dramatically improves the indoor air quality in a building
  • Cleaning process can be used on all heat exchange coils
  • Saves time with no detailed preparation required
  • Safe in all working environments and easy to use
  • Will not damage heat exchange coils
  • No need for high pressure washing in most instances
  • Reduces damage to heat exchange coils
  • Easy and safe to transport
  • No odours

Download the AerisGuard Bioactive Enzyme Coil Cleaner PDF

Indoor Air Quality

Guidlines for a healthier workplace…

Despite an image  as the nation which loves the great outdoors, Australians spend some 90% of their time indoors.  As a consequence, indoor air quality and the health problems created by contaminated air are issues of very significant community health concern.

Download Indoor Air Quality PDF

AerisGuard Protective Coatings

AerisGuard™ Maintenance is the first environmentally friendly coatingoffering corrosion protection for outdoor heat exchange coils.

AerisGuard Maintenance is an innovative solution developed by AerisGuard providing comprehensive corrosion protection through a unique coating applied to heat exchanger condenser coils. Through extensive long term field testing, AerisGuard Maintenance has proven to be applied safely and easily delivering long term protection against environmental corrosion.

Download the AerisGuard Maintenance PDF


Air-Quality

Comments (0)

Client: BHP Billiton Mitsubishi Alliance

Location: Goonyella Riverside Mine

Brief: Remove box airconditioning units and replace with

22 Fujitsu Split Systems including building works and painting.

Start Date: 20/3/2010 Completion: 30/5/2010

Categories : Projects
Comments (0)

Client: BHP Billiton Mitsubishi Alliance

Location: Goonyella Riverside Mine

Brief: Design and construct new 33 Kilowatt Actronair Packaged unit

For Field Maintenance Mezzanine Floor project.

Start Date: 1/5/2010 Completion: 30/6/2010

Categories : Projects
Comments (0)

Client: BHP Billiton Mitsubishi Alliance

Location: Goonyella Riverside Mine

Brief: Replace all ductwork within the Goonyella Riverside Mine

Administration Building and Digital Controls and Economy Cycle Upgrade

Including all civil and building works

Start Date: 1/5/2010 Completion: 30/8/2010

Consulting Engineer: Mr. Brian Talty of A/C Design Services

Categories : Projects
Comments (0)