Here is a summary of a small sample of the projects that we have completed.

Project: Shovel 34
Client: BHP Billiton Mitsubishi Alliance
  • Brief: Overhaul cabin and P.C.R. Air conditioning Units and replace major components.
  • Start Date: 6/8/2012
  • Completion: 25/9/2012
Project: Dragline 29
Client: BHP Billiton Mitsubishi Alliance
  • Brief: Overhaul cabin and P.C.R. Air conditioning Units and replace major components.
  • Start Date: 22/5/2012
  • Completion: 16/7/2012
Project: CPP1 Train Load out facility
Client: BHP Billiton Mitsubishi Alliance
  • Location: Goonyella Riverside Mine
  • Brief: Replace all existing ductwork within and below the M.C.C and install new Actron Packaged unit and stainless steel ducting. Including all Civil, Plumbing and building works.
  • Start Date: 14/8/2011
  • Completion: 25/9/2011
Project: Dragline 3
Client: BHP Billiton Mitsubishi Alliance
  • Brief: Overhaul cabin and P.C.R. Air conditioning Units and replace major components.
  • Start Date: 1/5/2011
  • Completion: 30/6/2011
Project: Shovel 33
Client: BHP Billiton Mitsubishi Alliance
  • Brief: Overhaul cabin and P.C.R. Air conditioning Units and replace major components.
  • Start Date: 12/2/2011
  • Completion: 16/4/2011
Project: Dragline 14
Client: BHP Billiton Mitsubishi Alliance
  • Brief: Overhaul cabin and P.C.R. Air conditioning Units and replace major components.
  • Start Date: 24/9/2010
  • Completion: 30/11/2010
Project: Riverside Administration Building A/C Upgrade
Client: BHP Billiton Mitsubishi Alliance
  • Location: Goonyella Riverside Mine
  • Brief: Replace all ductwork within the Goonyella Riverside Mine Administration Building and Digital Controls and Economy Cycle Upgrade Including all civil and building works.
  • Start Date: 1/5/2010
  • Completion: 30/8/2010
  • Consulting Engineer: Mr. Brian Talty of A/C Design Services
Project: Field Maintenance Mezanine Floor Offices
Client: BHP Billiton Mitsubishi Alliance
  • Location: Goonyella Riverside Mine
  • Brief: Design and construct new 33 Kilowatt Actronair Packaged unit.
  • For Field Maintenance Mezzanine Floor project.
  • Start Date: 1/5/2010
  • Completion: 30/6/2010
Project: Business Excellence Building A/C Upgrade
Client: BHP Billiton Mitsubishi Alliance
  • Location: Goonyella Riverside Mine
  • Brief: Remove box air conditioning units and replace with 22 Fujitsu Split Systems including building works and painting.
  • Start Date: 20/3/2010
  • Completion: 30/5/2010
Project: Riverside Train Load out Clean Coal Substation
Client: BHP Billiton Mitsubishi Alliance
  • Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
  • Brief: Design and Construct 47 kilowatt Actron Packaged System and associated ductwork. Commission and provide 12 Months Service.
  • Start Date: 14/8/2008
  • Completion: 30/9/2008
Project: Dragline 27
Client: BHP Billiton Mitsubishi Alliance
  • Brief: Overhaul cabin and P.C.R. Air conditioning Units and replace major components.
  • Start Date: 1/2/2008
  • Completion: 30/3/2008
Project: GoonyellaWash plant Main M.C.C (Sub 03)
Client: BHP Billiton Mitsubishi Alliance
  • Location: Goonyella Riverside Mine, Goonyella Rd Moranbah.
  • Brief: Design and Construct a 40 KW A.P.A.C packaged unit and an 85 KWA.P.A.C remote air cooled packaged unit with 1.2 mm stainless steel ducting. Re-locate existing Temperzone airconditioning system.
  • Start Date: 28/3/2006
  • Completion: 30/6/2006