Archive

Airconstruct has been a Bronze sponsor of the Special Children’s Christmas party for over eight years. We have been along on the day and it’s a great to see the...

Intro: The iCool unit was developed by Airconstruct HVAC under an Ausindustry Research and Development Program in 2009. Concept: Would it be possible to produce a unit with better durability for heavy machinery...

Airconstruct have recently acquired an Actron 16 kilowatt ESP vertical Packaged unit to enter into a hydrocarbon case study of our own. We will be using our climacheck system to...

Client: BHP Billiton Mitsubishi Alliance Start: Jan-2017 Finished: Mar-2017 Upgrade Airconditioning in Dining Room 2 x VRF Systems totalling 124 Kilowatts capacity with 8 new cassettes and incorporated outside air. ...

Client: BHP Billiton Mitsubishi Alliance Start: Nov-2016 Finished: Dec-2016 Upgrade existing 64 and 33 kilowatt APAC ducted systems including deploying a control strategy and increase capacity by installing a new 40.0 kilowatt VRF...

Client: Department of Justice and Attorney General Start: Oct-2016 Finished: Oct-2016 Replace 185 Kilowatt Chiller and Fan Coil Units and upgrade existing mechanical electrical systems to full Building management deployment....

Client: BHP Billiton Mitsubishi Alliance Start: Jun-2016 Finished: Jun-2016 Upgrade existing canopies to Halton Hoods and all fans....

Client: BHP Billiton Mitsubishi Alliance Start: May-2016 Finished: May-2016 Install 65 Kilowatt Actron Packaged Unit to MCC 5....

Client: BHP Billiton Mitsubishi Alliance Start: Oct-2013 Finished: Apr-2016 Ongoing monthly maintenance of all Airconditioning systems and HVAC Hygiene through the wash plant area....

Client: Building and Asset services Start: Dec-2015 Finished: Dec-2015 Design and Construct replacement of HVAC systems totaling 300 kilowatts for Longreach School of Distance Education. ...

Client: Mackay Regional Council Start: 14/12/2015 Finished: 2/02/2016 Replace 11 x air handling units varying in size from 16 to 120 Kilowatt, new chilled water and condenser water loop pumps and cooling tower...

Client: Anglo American Start: Nov-2014 Finished: Jan-2015 Design and install ducting in a modular format to allow future transformer change outs for the Washplant MCC....

Call us on 1300 AAAHVAC to arrange your free building HVAC audit and report