Airconstruct

Design, construction, integration and maintenance

About

What is Airconstruct?

We specialise in the design, construction, integration and disciplined maintenance of air conditioning and ventilation systems for residential, commercial, mining and other heavy industries. Airconstruct commenced trading on July 1st 2001, and has grown steadily over the last 12 years. We are based in Mackay QLD, and are proudly locally owned and operated. Airconstruct is the legacy business from which all other ideas are born.

Benefits

Why choose Airconstruct?

Leadership

You acquire a contractor with leadership and one of the lowest T.R.I.F. rates in any industry which keeps our morale high.

Excellence

We stand out as a pocket of excellence among other essential services contractors locally.

Experience

We have been engaged in the mining sector full time for eight years and have built our reputation on safety, performance, execution and deliverables.

Projects

We have completed six dragline and shovel shutdown projects over the last four years as well as many infrastructure projects.

HVAC

We are Fujitsu and Actron dealers and provide support for all types of H.V.A.C. equipment including Sigma, A.P.A.C.

Fridges / Icemakers

We also install and service Orford refrigeration cabinets and Manitowoc Icemakers.

Vents

We have improved tunnel ventilation systems on above ground mine sites and can test and certify your tunnel vents and smoke dampers contained in your H.V.A.C. Installation.

Truck Aircon

We repair cabin air conditioning on trucks and drills.

Engage Airconstruct

Airconstruct welcomes all tender opportunities from small commercial premises through to large complex installations across all sectors. Our design team can work on budget estimates for feasibility studies, offer turnkey design and construct packages or we can prepare lump sum prices from your consultants drawings. We utilise the Estimate One And Building Industry online portals for document transmittal. We have PQC Level 3 Queensland Government Certification so please keep us in mind for your next Government project . Please contact David Jones on 0438 889 699 for any urgent commercial matters. If you require rental cooling solutions click here. For any urgent breakdowns you can call our after hours number – 07 4951 0282.

If your enquiry is of a general nature please use the contact form.

Airconstruct car
Airconstruct worker

Equipment we service

  • Draglines
  • Shovels
  • Wash Plants
  • Stackers
  • Reclaimers
  • Air Dryers
  • Ice Machines
  • Commercial fridges
  • Package Units
  • Split A/C
  • Ducted A/C
  • RAC
  • Ventilation: Induced and Extraction
  • Fresh Air
  • Water Bubblers
  • Air Dampers: Fire and Fresh Air
  • VRF
  • Evaporative Coolers

Airconstruct

Downloads

ActronAir Bringing Big Ideas To Life
ActronAir Bringing Big Ideas To Life
ActronAir Product Range
ActronAir Product Range
2014 Airconstruct Capability Statement
2014 Airconstruct Capability Statement
Scope Of Services
Scope Of Services

History

Timeline

July 2001

Airconstruct is registered as a company on 4th July, 2001.

May 2004

First mine site project completed in 2004.

November 2004

Awarded Shorelines and Qualia projects on Hamilton Island.

April 2008

Acquired air-care duct cleaning system and overseas training.

November 2008

Launched R&D project for I-cool dragline airconditioning unit.

July 2009

Awarded major maintenance contract at Goonyella Riverside.

May 2010

Awarded dragline and shovel major maintenance at Goonyella Riverside.

July 2010

Developed business and strategic plan.

April 2011

Developed and implemented integrated management systems to eventuate in third party certification.

September 2010

Acquisition of land in Clermont for operational base to be constructed.

September 2012

Acquisition of commercial premises in Mackay for national headquarters.

April 2013

Achieved S.A.I. Global Certification for Safety, Quality and Environment.

July 2013

Achieved major project supplier status.

January 2014

Began construction of operational base at Clermont.

February 2014

Consolidation of growth strategy.

March 2014

Aeris Guard applicator endorsements.

May 2014

Awarded first Department of Justice and Attorney General contract.

June 2014

Awarded first Queensland Health project.

July 2014

Completed first chiller project for Aurizon Network Operations Centre.

August 2014

Awarded preferred contractor status to Aurizon.

September 2014

Completed second Queensland Health project.

Call us on (07) 4951 0282 to arrange a free 17 point hvac inspection.